(click in each photo to enlarge it
)- Club de Pesca Barranquilla
January 2006 |
 Topo
view: Forward Pulpit and anchor suport. Pulpit made with 1
1/4" and 3/4" diameter Stainless steel pipe.
|
|
 It
was a good job, the pulpit welded to the hull giving good support. |
|

Interior being prepared for thermic insulation installation.
|
|
 Fresh water distribution tank, made in Fiber glass |
|
|
 The tank will be used to receive the
potable water and from here distributed to the other 7 water tanks |
|

The 7 tanks are connected to the distributing tank via Flex non toxic hose
via valves. |
|
 All
Fiber glass water tanks after painted ready to be installed
|
|
 Interior
and thermic insulation.
|
|
|
 The
thermic insulation will make the interior to be comfortable.
Over cool waters will avoid the interior become cool. In
hot tropics will avoid become hot inside. |
|

Thermic insulation..
|
|
Project in photos:
 |