(click in each photo to enlarge it )-  Club de Pesca Barranquilla January 2006

Topo view: Forward Pulpit and anchor suport. Pulpit made  with  1 1/4" and 3/4" diameter  Stainless steel pipe.

 

 

It was a good job, the pulpit welded to the hull giving good support.

Interior being prepared for thermic insulation installation.  

 

 

Fresh water distribution tank, made in Fiber glass

 

The tank will be used to receive the potable water and from here distributed to the other 7 water tanks

 

The 7 tanks are connected to the distributing tank via Flex non toxic hose via valves.    

All Fiber glass water tanks after painted ready to be installed

 

 

Interior and thermic insulation.

 

 

The thermic insulation will make the interior to be comfortable.

Over cool waters will avoid the interior become cool. In hot tropics will avoid become hot inside.

 

Thermic insulation..   

 

Jun 2006

Jun 2006 start the wooden works inside, first plywood as bulkheads.

 

Plywood and thermical insulation

 

Teak wood on sides

 

Forward bulkhead with Teak wood.

November 2006
Imported engine and generator from Deutz - China   Generator set
 
Marine Engine Deutz TD229B-4C   Marine transmission ZF 220A installed already in the Deutz engine

Project in photos: