HOME
Boat specifications
Wayra Stability
Project in photos
Work team
Log book
Owner's background
Contac Us
Signe My Guest book

 

Collaborators links

Mercamaquinas

www.hidalgo-s.com

Marine paints

 
 

Assembling frames (upside down) May 2003
First frames being mounted over the train rails as base.   More frames forming the hull.The dimension of radius is the same for all frames.
 
The technical drawer: Bernardo Lopez inspecting the project.   You can see the aft bulkhead in place. Also you can see the slots over the frames. throughout them the stringers or longitudinals  will cross.
 
Here you can see the aft and forward bulkheads, the keel and stringers already installed over the frames.   In the middle only pipes temporary fixed to hold the structure at all.
 

Project in photos:

                     Back Next

 All rights reseved to www.sailboatwayra.com   modified: 23-09-2009